WMS Panel Assessment Main Questions
1. Introduce yourself briefly and what is the main role/Responsibility as PA/JP
- PA: Performing Authority needs to provide a clear and adequate description of the work to be carried out with sufficient detail, and ensure that Permit Request is complete with up-to-date. JSA covering full work scope ALARP attached to the Permit.
- JP: Job Performer needs to commence the work in a safe condition related to the worksite with Tools and Equipment, Conduct Tool Box Talk with work Groups and keep on monitoring the site activity
- JP: Accepts the Permit from PI after checks the worksite is clear and maintained in safe condition with PI
- When the Permit needs to be revalidated (Next Shift) JP needs to inform PI and AA to get the Permit Revalidated for 12 hrs
- When the Permit needs to Closed ( Permit is expired after 7 calender day) JP needs to suspend the work and inform to PA that the work is done and the worksite is clear and maintanined in safe condition. then PA request for the closure of the Permit to PI and AA
- PA: Performing Authority
- JP: Job Performer
- JSA: Job Safety Analise
- ALARP: As Low As Reasonable and Practicable
- TBT: Tool Box Talk
- PI: Permit Issuer
- AA: Area Authority
- I will visit the worksite with PI to Check
- Site situation hazards
- Work Party
- Equipment
- Material and
- Documents
- I will abide by the direction of the PI regarding clearance to commence work or instruction to suspend or stop the work
- Emergency response Procedure
- Roles and Responsibilities
- ADNOC Life Saving Rules
- I will Supervise and Monitor the site throughout the activities
- I will conduct Dynamic Risk Assessment during the Job
- I will ensure work Party members clear from the site
- Personal Lock Removed
- Work Status
- Housekeeping Done
- Equipment left in safe condition, then
- I inform to PA
admin
10 Jul 2024
1. What is WMS? Work Management System It is a Safety Tool that the Work is Properly Controlled, Coordinated and Communicated (3C) 2. What are the Modules of WMS? PTW (Permit to Work) JSA (Job Safety Analist) EI (Energy Isolation) TD (Temporary Depeat) SIMOPS (Simultanous Operations) 3. What are the Life Saving Rules (At least …
admin
10 Jul 2024
WMS Exam questions and answers ADNOC, WMS EXAM·Jun 24, 2024 Work Management system (WMS) PERMIT TO WORK ASSESSMENT BOOKLET Insrtuctions This assessment shell be completed individually as part of the WMS Permit To Work Training Fill in Name, Company, Designatioan & Date In BLOCK LETTERA! ON THE COVER SHEET The assessment contain 55 Questions …
11 May 2023 139 views
What is “cargo plan”. When applied to a ships A discussion between the shore and ship to plan the procedure for loading cargo Notices to marine _________ carefully and regularly to avoid grounding Should be studied Wreck sand rock are not easily _________ by the signal Detected To help the preparations to leave the …
01 Apr 2023 102 views
Pilotage A1/4.1 Pilot request See AI/6 – .4.3 “Pilot request” A1/4.2 Embarking / disembarking pilot 1 Stand by pilot ladder. 2 Rig the pilot ladder on port side / starboard side/leeside … metres above water. 3 The pilot ladder is rigged on port side / starboard side. 4 You must rig another pilot ladder 5 The pilot ladder is …
10 Jul 2024 93 views
1. What is WMS? Work Management System It is a Safety Tool that the Work is Properly Controlled, Coordinated and Communicated (3C) 2. What are the Modules of WMS? PTW (Permit to Work) JSA (Job Safety Analist) EI (Energy Isolation) TD (Temporary Depeat) SIMOPS (Simultanous Operations) 3. What are the Life Saving Rules (At least …
11 May 2023 89 views
PLAN A VOYAGE AND CONDUCT NAVIGATION Publications containing information on Naval Control of Shipping (NCS) in times of emergency or war are ? 117, Radio Navigational Aids In determining the characteristics of the lamp which is the main light or an offshore buoy when passing at night, what is? Any of the above …
10 Jul 2024 83 views
1. Introduce yourself briefly and what is the main role/Responsibility as PA/JP PA: Performing Authority needs to provide a clear and adequate description of the work to be carried out with sufficient detail, and ensure that Permit Request is complete with up-to-date. JSA covering full work scope ALARP attached to the Permit. JP: Job Performer …
Comments are not available at the moment.