Home » WMS » WMS Panel Assessment Main Questions

WMS Panel Assessment Main Questions

admin 10 Jul 2024 83

1. Introduce yourself briefly and what is the main role/Responsibility as PA/JP

    • PA: Performing Authority needs to provide a clear and adequate description of the work to be carried out with sufficient detail, and ensure that Permit Request is complete with up-to-date. JSA covering full work scope ALARP attached to the Permit.
    • JP: Job Performer needs to commence the work in a safe condition related to the worksite with Tools and Equipment, Conduct Tool Box Talk with work Groups and keep on monitoring the site activity
    • JP: Accepts the Permit from PI after checks the worksite is clear and maintained in safe condition with PI
    • When the Permit needs to be revalidated (Next Shift) JP needs to inform PI and AA to get the Permit Revalidated for 12 hrs
    • When the Permit needs to Closed ( Permit is expired after 7 calender day) JP needs to suspend the work and inform to PA that the work is done and the worksite is clear and maintanined in safe condition. then PA request for the closure of the Permit to PI and AA
      • PA: Performing Authority
      • JP: Job Performer
      • JSA: Job Safety Analise
      • ALARP: As Low As Reasonable and Practicable
      • TBT: Tool Box Talk
      • PI: Permit Issuer
      • AA: Area Authority
2. As a JP before commencing the Job
  • I will visit the worksite with PI to Check
    • Site situation hazards
    • Work Party
    • Equipment
    • Material and 
    • Documents
3. PI will demonstrate “Zero Energy Isolation” I will be withness of  Zero Energy Isolation demonstration
  • I will abide by the direction of the PI regarding clearance to commence work or instruction to suspend or stop the work
4. I will conduct TBT with my work Party and discuss the Job specific hazards and control measures
  • Emergency response Procedure
  • Roles and Responsibilities
  • ADNOC Life Saving Rules
  • I will Supervise and Monitor the site throughout the activities
  • I will conduct Dynamic Risk Assessment during the Job
5. After Completing of or end of the Shift
  • I will ensure work Party members clear from the site
  • Personal Lock Removed
  • Work Status
  • Housekeeping Done
  • Equipment left in safe condition, then
  • I inform to PA

Comments are not available at the moment.

Leave a Reply

Your email address will not be published. Required fields are marked*

*

*

Related post
WMS or Work Management System

admin

10 Jul 2024

1. What is WMS? Work Management System It is a Safety Tool that the Work is Properly Controlled, Coordinated and Communicated (3C) 2. What are the Modules of WMS? PTW (Permit to Work) JSA (Job Safety Analist) EI (Energy Isolation) TD (Temporary Depeat) SIMOPS (Simultanous Operations) 3. What are the Life Saving Rules (At least …

WMS Exam questions and answers

admin

10 Jul 2024

  WMS Exam questions and answers ADNOC, WMS EXAM·Jun 24, 2024   Work Management system (WMS) PERMIT TO WORK ASSESSMENT BOOKLET Insrtuctions This assessment shell be completed individually as part of the WMS Permit To Work Training Fill in Name, Company, Designatioan & Date In BLOCK LETTERA! ON THE COVER SHEET The assessment contain 55 Questions …